IPAL Operations Command Center
PT Industri Jaya Mandiri · 5 sites
LIVE
12.58.55
Selasa, 22 Sep
15
Total IPAL
7
Normal
6
Warning
2
Critical
0
Offline
4
Active Alerts
4
Sensor Offline
Rp 34.5M
Cost (Month)
Live Tank Monitoring
65%
Holding Tank
65% · Attention
48%
Wastewater Tank
48% · Normal
42%
Collection Tank
42% · Normal
78%
Secondary Tank
78% · Warning
95%
Primary Tank
95% · Critical
55%
Buffer Tank
55% · Normal
28%
Chemical Tank
28% · Normal
63%
Overflow Tank
63% · Attention
52%
Main IPAL Tank
52% · Normal
71%
Neutralization Tank
71% · Attention
38%
Effluent Tank
38% · Normal
92%
Sludge Tank
92% · Critical
45%
Sedimentation Tank
45% · Normal
82%
Aeration Tank
82% · Warning
67%
Equalization Tank
67% · Attention
Active Alerts
ALT-0004HIGH
Tank level 82% — above warning threshold.
Factory Surabaya Main · Aeration Tank
ALT-0003HIGH
Pump FAULT detected — pump not running.
Factory Gresik · Primary Tank
ALT-0002CRITICAL
Sludge tank at 92% capacity — risk of overflow.
Factory Surabaya Main · Sludge Tank
ALT-0001CRITICAL
Tank level 95% — exceeds critical threshold. Immediate drainage required.
Factory Gresik · Primary Tank
Drainage Due
3 tanks need drainage
Maintenance
2 scheduled this week
Uptime
98.7% sensor availability